Waste Energy Recovery - Blois, France

1996...2008
Construction and retrofitting (according to 2005 standards) of the multi line centre for waste treatment
download(en)

Solid waste management in Essaouira, Marocco

2003...2006
Provide assistance to the Municipality for the project management & coordination and for the supervision of works -validation of execution studies, tender documentation and tenders analysis, coordination, administrative, technical
& financial project management, works supervision,
elaboration of the environmental monitoring plan
download(en)

Waste-to-Energy Facility Südwestthüringen, Germany

2003...2006
Waste-to-Energy Plant
Capacity: 160,000 Mg/a
  • General planning and project management in consortium
  • Preparation of permission documents and management of permission procedures
  • Preparation of bidding documents and evaluation of tender documents for balance of plant
  • Detailed design
  • Overall project supervision / Site supervision
  • Commissioning
download(en)

Waste-to-Energy Facility GMVA Oberhausen, Germany

2002...2006
Retrofit of a work to Energy Plant with grate system
Capacity (retrofit): 180,000 Mg/a
Capacity (total): 578,000 Mg/a
  • Conceptual design
  • Basic engineering
  • Preparation of permission documents and management of permission procedure
  • Preparation of bidding documents
  • Evaluation of tender documents (9 lots)
  • Detailed design
  • Site supervision
  • Commissioning
  • Overall project supervision
download(en)

Waste-to-Energy Facility Allington, UK

2000...2006
New installation for waste treatment for material and energy recovery
Capacity (EfW): 500,000 Mg/a
Capacity (MRF): 65,000 Mg/a
  • Study on FB-technology
  • Predesign
  • Approval of basic engineering
  • Evaluation of contract
  • Approval of detailed engineering
  • Site supervision
  • Commissioning
  • Project management
download(en)

Waste to Energy Recovery - Sarcelles, France

2004...2005
Rebuilding of the waste to energy plant
download(en)

Waste-to-Energy Facility TEV Neumünster, Germany

2003...2005
Steam generator with CFB, based on RDF
Thermal capacity: 75 MWth
Annual capacity: 150,000 Mg/a
  • Project management
  • Control of detailed engineering
  • Detailed engineering for auxiliary installation
  • Site supervision
download(en)

A.T. Bioenergy Power Plant, Thailand

2002...2005
A.T. Biopower Co. Ltd. intends to construct four identical power plants in Pichit, Nakhon Sawan, Singburi and Nakhon Pathom. With a power production capacity of approximately 22 MWe (gross), each the Power Plant shall comprise of one power block consisting of one biomass-fired boiler, a single condensing steam turbine and a generator, and all necessary auxiliary equipment associated with this type of plant. The Power Plant is required to utilize the available rice husk supplied by A.T. Biopower Co. Ltd. as fuel, and will supply power to the Electricity Generating Authority of Thailand (EGAT) under EGAT's SPP Contract Small Power Producer (SPP) Program. The major investors of A.T. Biopower are Rolls Royce Power Ventures, a subsidiary of Rolls Royce PLC., Al Tayyar Energy, a Dubai-based renewable energy equity fund, and Flagship Asia Co. Ltd., a Labuan-based (Malaysia) renewable energy development company.
TH2025_ATB.pdf

Waste-to-Energy Facility HVC N-H Alkmaar, Netherlands

2002...2005
Installation of a 4th line
Capacity (new): 150,000 Mg/a
Capacity (total): 620,000 Mg/a
  • Project development
  • Evaluation of the tender documents
  • Supervision and coordination of detail engineering
  • Site supervision
  • Commissioning
  • Supervision of the project
download(en)

Integrated solid waste management project

2001...2004
Assessment of Municipal Solid Waste management in Baia Mare and its area representing a total population of 220,000 inhabitants in all technical,environmental, legal and financial aspects.
download(en)
1...10 (Total 36)