Projects
Umweltzentrum Simmering
2005...2008
Umweltzentrum Simmering - Müllverbrennung Biogas
Wiener Kommunal-Umweltschutzprojektgesellschaft mbH (WKU)
Simmering, Wien, Österreich
download(de)Siah Bishe Pumped Storage Project, Iran
2003...2008
Siah Bishe Pumped Storage Project is located in the Elbrus Mountains, about 100 km north of Tehran. The project includes engineering design, interfacing, drawing preparation and construction supervision. The scheme consists of two CFRDs, twin headrace tunnels, shafts and a power cavern with an installed capacity of 4 x 250 MW. It is the first project in Iran for the design and construction of concrete faced dams and the first construction of a pumped-storage scheme.
download(en)New Naga Hammadi Barrage and Hydropower Plant, Egypt
1998...2008
The new barrage is located some 3.5 km downstream of the existing barrage and consists of 7 gated sluiceway bays, a powerhouse with 4 bulb turbines with a maximum discharge of 418 m3/s each, and two navigation locks. The total installed capacity of the plant is 64 MW, generating an average 464 GWh/a of energy. The sluiceway bays are equipped with 17 m wide and 13.5 m high radial gates with flap gates on the top of each gate.
download(en)Tsankov Kamak Dam and hydropower plant
2003...2007
Construction of a hydro power plant. Installed capacity 2 x 40 = 80 MW. Joint Implementation project. Financial set up of the Joint Implementation Project, review of the final design, organisation, scheduling and coordination, guideline design, detailed construction design, geological survey. Bulgaria
download(en)Ermenek Dam and HPP
2002...2007
Construction of a HPP. Installed capacity 2 x 150 = 300 MW. Consists of a 210 m high double-curved arch dam, a headrace tunnel, an inclined pressure tunnel, a powerhouse and a tailrace channel. Guideline drawings, execution design, geological survey and mapping, site management. Turkey.
download(en)Gerlos II Dam and HPP 2nd stage
2004...2006
2nd extension stage of a hydro power plant. Installed capacity = 135 MW. Feasibility study, final design, tender design, tender documents. Austria.
download(en)Pamir 1 Hydropower Scheme, Tadjikistan
2001...2006
Pamir 1 is an existing run-of-river scheme presently operating at 14 MW with two turbine generator units. The project will bring it to its design capacity of 28 MW with four units. Furthermore, work includes the rehabilitation of the two working units that have been in operation since 1995.
download(en)Tuirial Hydroelectric Scheme, India
1999...2006
Tuirial hydroelectric project is a low-head, storage scheme with seasonal reservoir storage capacity. The plant consists of a 77 m high earth dam with ancillary installations, a spillway with a capacity of 4450 m3/s, short waterways below ground and an open-air powerhouse with an installed capacity of 60 MW.
download(en)Mauvoisin Hydropower Scheme, Switzerland
1998...2006
Due to the silt deposits in the dam area of the 250 m high Mauvoisin Dam, new intake structures need to be provided for the intakes of the power and bottom outlet tunnels around 36 m higher than the existing ones.
download(en)Deriner Dam and Hydropower Plant, Turkey
1988...2006
A 670 MW storage power scheme located on the Coruh River, comprising the 247-m high Deriner dam as a double curvature arch structure. The underground power house will have four vertical Francis units of 167.5 MW each and the total energy production will be 2118 GWh/year.