Oil & Gas > Projects

Projects

Business area

Dolphin Energy Ltd.

2002...2003
A safety assessment of tank design concepts for the storage of the refrigerated LPG, in particular the choice between the single and double (or full) containment options.
Also a Complementary SIL assessment study to review the offshore and onshore SIL assessments and compare the proposed SIL ratings with similar equipment on other installations.

Petroleum Development Oman. Oman

2002...2003
Rima DWD phase 2. FED and DD for 3 off 5 MW deep water disposal pumps.

Petroleum Development Oman. Oman

2002...2003
NRPS 3rd large FWKO tank. DD for station expansion including a 39m dia free water knock out tank, 2 new emulsion transfer pumps, relocation of 2 emulsion transfer pumps and a new flare.

Petroleum Development Oman. Oman

2002...2003
Yibal compressor control systems upgrade. Conceptual, FED and DD for upgrading compressor control systems for 2 Avon gas turbine driven units, 2 Ruston gas turbine driven units and 1 Nuovo Pignogne electrically driven unit. Safeguarding and sequence control was done in Honeywell and Petrotech PLC based UCPs. Capacity and anti-surge control was done in Honeywell DCS.

Petroleum Development Oman. Oman

2002...2003
Marmul G central development. DD for station expansion including a 300 kW oil shipping pump, 4 MSVs and 3 multiphase flowmeters. Complete control and safeguarding system replacement with foundation fieldbus DCS and SIL 3 IPS. Zero deferment system changeover.

Petroleum Development Oman. Oman

2002...2003
Thuleihat WI phase 2. DD for station expansion including a 39m dia FWKO tank, a CPI separator, a 1.8 MW WI pump, a flare, 17 MSVs and 4 multiphase flowmeters. Complete control and safeguarding system replacement with foundation fieldbus DCS and SIL 3 IPS. Zero deferment system changeover.

Premier Oil. Indonesia

2001...2003
Hazard identification and Concept Safety Evaluation / FEED safety studies, including QRA, in support of the concept selection and project definition.
Preparation of project safety documentation, including HSE philosophy and Fire & Safety System Specification.

Premier Oil. Indonesia

2000...2003
Review of the safety studies undertaken for the Anoa Gas Export Project and co-ordination of review comments; preliminary and detailed risk assessment, demonstration of ALARP and production of formal safety assessment input for the safety case. Participation in HAZID, HAZOPs and a pre-startup Project Safety Review.

Crescent Petroleum. UAE

2001...2002
Crescent Petroleum minimum facilities platform. Conceptual engineering for a minimum facilities platform with wellheads, separation and well test facilities plus a 25 km subsea pipeline.

Petroleum Development Oman. Oman

2001...2002
Zauliyah station expansion. FED and DD for refurbishment and relocation of a gas compressor to Zauliyah station plus NGL recovery facilities. Compressor refurbishment covered by separate contract.
1...10 (Total 95)

next >>>

1...10 (Total 95)

next >>>