References Natural Gas Power Plants
Ca Mau, Combined cycle power plant, Petro Vietnam
The combined cycle power plant consists of two
F-technology gas turbine generator units,
each 240 MW, two HRSGs and one steam turbine
generator unit, with all associated auxiliary
equipment and support facilities.
Fuels: natural gas, fuel oil
Owner's engineer services:
Phase I:
Review of feasibility study, additional soil
investigation, preparation of conceptual design,
preparation of preliminary design,preparation of
investment cost estimate,preparation of EPC
specifications,additional civil design for material
take-off, design of electrical and SCADA/tele-
communication interconnection with National
Power System and support in approval process.
Phase II:
Evaluation of the EPC Contractor's proposal,
negotiations with the EPC contractor, design
review, construction supervision, project cost
and schedule control, 2003-2007
Detailed project description (PDF 173 kB)
Enso Española SA, Combined cycle power plant,
Castellbisbal, Spain
50 MWe/25 MWth, LM6000 gas turbine with DLE
combustion, HRSG with ambient air firing, extraction/
condensing steam turbine, hybrid cooling tower plant,
chilling plant for gas turbine inlet air cooling.
Project management, feasibility studies, conceptual
design, procurement services,process engineering,
water treatment engineering, plant layout, auto-
mation engineering, automation detailed design and
supervision, electrical engineering, piping design,
structural design, HVAC engineering, house electrifi-
cation basic design, permits and licences, architectural
design, time scheduling services, site supervision,
general training, acceptance tests and GT plant main-
tenance procurement, 1996
Detailed project description (PDF 406 kB)
Jandar combined cycle power plant,
Syrian Arab Republic
700 MWe combined cycle power plant,
4x118 MWe MW701 gas turbines,
2 x 114 MWe condensing steam turbine,
air cooled condenser
Fuels: natural gas, refinery gas and fuel oil
Complete project management and implementation
supervision of turnkey delivery: design, engineering,
manufacturing and assembly. Civil works, erection,
commissioning, test runs, guarantee period, training,
1995
Detailed project description (PDF 544 kB) |