Safety and Reliability
The Pöyry Energy business group has successfully applied a wide variety of advanced elements of safety technology and safety assessment methodologies to the above types of facility to achieve demonstrably comprehensive and systematic Probabilistic Safety Assessments (PSAs) and, where appropriate, Deterministic Safety Assessments.
Pöyry energy services include the following areas:
- Safety Criteria Development (design phase, operating facilities, plant decommissioning).
- Fault/Hazard Identification in support of safety, reliability and risk assessments, including HAZOP studies, FMEA techniques etc.
- Safety Assessments including supporting analysis of hazards, vulnerability and damage.
- Availability, Reliability & Maintainability of existing and novel Process Plant.
- Maintenance Optimisation including Reliability Centred Maintenance.
- Design Optimisation/Justification, from a safety viewpoint.
- ALARA/ALARP Studies, both qualitative and quantitative.
- Safety Case Preparation, to meet HMNII and other licensing requirements.
- Independent Peer Review of safety, reliability and risk assessments and safety cases, on behalf of both the licensee and the licensing authority.
- Consequence Modelling, to address effects to both on-site and off-site groups.
Summary Project List
Support for Safety Case Preparation - AGR Dry Fuel Store, British Energy
Safety Appraisal Study for existing and new facilities - Aldermaston, AWE
Preparation of Pre Construction, Pre Commissioning and Operational Safety Reports for the First Intermediate Level Waste Encapsulation Plant (EP1), Encapsulated Product Store (EPS1) and Services Building (EPSB1) - Sellafield, British Nuclear Fuels
Preparation of Safety and Legal Cases for Retrieval of Material from Vault 8 at Drigg - Sellafield, British Nuclear Fuels
Preparation of Safety Reports for the Waste Compaction Plant at Drigg - Sellafield, British Nuclear Fuels
Risk assessment of Magnox waste debris vaults, BNFL
Production of Pre Commissioning Safety Report (PCSR) for the Segregated Effluent Treatment Plant - Sellafield, British Nuclear Fuels
Safety Assessment and Preparation of Safety Case Documentation for the Radwaste Treatment Plant and Associated Store - Sellafield, British Nuclear Fuels
Specification of form, timescale and content of safety reports and submissions, and probabilistic fault analysis, required to obtain necessary licensing approvals or input into design specifications - Sizewell B Power Station, Central Electricity Generating Board & Nuclear Electric
Project management of Whole Base Safety Case and provision of specialist nuclear advice - Devonport Dockyard, Ministry of Defence
Specialist safety/engineering appraisals and assessments of the ventilation systems of numerous facilities - AWE Sites, AWE
Feasibility study for the upgrade of A45 ventilation system - Aldermaston, AWE
Preparation of safety assessment, safety cases and associated documentation for numerous facilities in support of AWE Site Licensing - AWE Sites, AWE
Provision of specialist nuclear advice for future projects feasibility studies - Devonport, Faslane & Rosyth Dockyards, Ministry of Defence
Nuclear Works Advisor for RD102 Dock Enhancement Project - Rosyth Dockyard, Ministry of Defence
Level 2 Probabilistic Safety Assessment - Leibstadt BWR Power Station, Kernkraftwerk Leibstadt AG
Specialist assistance on Availability, Reliability and Maintainability modelling of novel process plant - Sellafield, British Nuclear Fuels
Provision of facility maintenance support including preparation of maintenance policy, strategy and instructions and EMIT schedules and undertaking spares reviews - AWE Sites, AWE
Preparation of safety cases for transportable effluent tanks and the effluent receipt and transfer system - Devonport Dockyard, Devonport Management Limited
Design and safety peer review for the RD46/3 dock enhancement project., Rosyth Dockyard, TBV Schal Provision of technical advice with respect to nuclear power restructuring and privatisation in the UK - Department of Trade and Industry
Appraisal of Swedish utilities nuclear assets - Barclays de Zoete Weld
Probabilistic Safety Assessment in support of continued operation - Wylfa Magnox Power Station, Nuclear Electric
Rationalisation Feasibility Study for AWE Sites facilities - AWE Sites, AWE
Preparation of hazards assessment section of the Operating Plant Safety Cases produced to meet NII Site Licensing Requirements - Dounreay, UKAEA
Preparation of Safety Justification for B205 Ventilation System - Sellafield, British Nuclear Fuels
Safety support on refurbishment of trade waste liquid effluent collection system - AWE, Aldermaston, Costain Engineering
Quality Assurance Auditing of HAZOP Studies for plant modifications and safety reappraisals of nuclear chemical plant - Sellafield, British Nuclear Fuels
Safety assessment and preparation of safety documentation for operations in the West Ponds Area at Sellafield - British Nuclear Fuels
Preparation of PCSR for B229 Laboratories - Sellafield, British Nuclear Fuels
Preparation of safety and legal cases for retrieval of material from Vault 8 at Drigg - Drigg Waste Disposal Facility, British Nuclear Fuels
Preparation of the PCSR for the Waste Packaging and Encapsulation Plant - Sellafield, British Nuclear Fuels
Provision of support to revise and update DIDO HAHC safety documentation - Harwell Nuclear Establishment, UKAEA
Production of safety reports for the Sellafield site rail networks - Sellafield, British Nuclear Fuels
The provision of the safety documentation required to meet the operating authorisation requirements of the D2O filtration plant - Harwell Nuclear Establishment, UKAEA
Probabilistic Safety Assessment and Human Factors Assessment in Support of Continued Operation - Sizewell A Magnox Power Station, Nuclear Electric
Probabilistic Safety Assessment in Support of Continued Operation and Plant Modification - Bohunice V-1 VVER Power Station, European Union (PHARE)
Site electrical distribution upgrade and refurbishment sensibility study - Harwell, UKAEA
Living Probabilistic Safety Assessment - Leibstadt PWR Power Station, Kernkraftwerk Leibstadt AG
Justification to increase period between Statutory Outages - Dungeness B, Hinkley Point B, Heysham 1 and Hartlepool AGR Power Stations, Nuclear Electric